Photos: Qube's Pictures

Testturm Thyssenkrupp

Location / City Rottweil, Deutschland
Year of Construction / Completion 2017
Construction Type New Construction
Contractor Strabag Metallica
Client Thyssenkrupp

The skyscrapers being planned and built around the world are getting ever taller and more spectacular. To ensure that the upper floors can be accessed quickly and safely, new lift solutions are required; Thyssen-Krupp is testing the development of these solutions on a unique test tower in Rottweil, Baden-Württemberg. Find out more at www.baunetzwissen.de

Reference

FRAME+ 75 DI – Aluminium door
System depth
75 mm
Applications
Wall panel
Facade insert
Leaf-enclosing panel sections
Minimum width of the active leaf
310 mm
Minimum width of inactive leaf
310 mm
Go to product

FRAME+ 75 DI – Aluminium door

FRAME+ 75 WI – Insertion window
Uf- value2
≥ 1,0 W/(m2K)
System depth
75 mm
Applications
Wandfenster
Fassaden-Einsatzelement
Max. weight turn-tilt surface-mounted fitting
130 / 160 / 200 kg*
Go to product

FRAME+ 75 WI – Insertion window

THERM+ S-I – Steel façade
System width
50 / 56 / 76 / 96 mm
For steel profiles from
50 mm width
Steel profiles in T shape
60 mm width, 60 / 90 / 120 mm depth
Infill thickness
4 – 64 mm
Go to product

THERM+ S-I – Steel façade

Back to overview

Your RAICO expert for windows | doors | facades 

Do you have any questions?

Our experts will be happy to advise you!